Countertop Installation

Countertop Installation in Westchester County, NY

We template, fabricate, and install all countertops in-house — no outsourced stone yard, no third-party scheduling. One team, end to end.

How countertop installation works

1

Cabinet completion

We wait until all cabinets are fully installed and level before templating. Premature templating is a common source of countertop fit problems.

2

Digital templating

Our team uses digital templating technology to measure your cabinet layout with pinpoint precision. The template is used to program CNC cutting.

3

Slab selection

If you haven't already selected your slab, we bring you to the slab yard to choose your exact piece. No two natural stone slabs are identical.

4

Fabrication

Your countertop is cut, edged, and finished in our fabrication shop. Edge profile, cutouts, and waterfall panels are all fabricated precisely.

5

Installation

Our stone team installs your countertops — typically in one day. Seams are placed in low-visibility locations and finished with color-matched epoxy.

6

Sealing & care

Natural stone is sealed after installation. We provide care instructions for your specific material.

Materials we install

  • Quartz (Cambria, Silestone, Caesarstone, MSI)
  • Quartzite (Taj Mahal, Perla Venata, Super White)
  • Marble (Calacatta, Carrara, Statuario)
  • Granite
  • Porcelain slab (Dekton, Laminam)
  • Butcher block (islands and specialty areas)

Edge profiles

Edge profile affects both appearance and safety. Common options include:

EasedBeveledBullnoseOgeeMiter (thick edge)Waterfall

Countertop Installation FAQ

How long does countertop installation take?

Countertop installation itself takes 1–2 days once the slabs are fabricated. Fabrication takes 1–2 weeks after templating. Templating occurs after cabinets are fully installed. The full process from cabinet completion to countertop installation is typically 2–3 weeks.

Do you handle countertop removal and disposal?

Yes. We remove and dispose of existing countertops as part of the renovation process. If you have laminate, tile, or other materials, we handle complete demolition before new countertop installation.

How do I choose between quartz and quartzite?

Quartz is engineered — uniform, non-porous, no sealing required, and available in hundreds of consistent patterns. Quartzite is natural stone — each slab unique, requires annual sealing, and harder than marble. Quartzite tends to cost more and requires more maintenance.