Our Specialty

Kitchen Remodeling
Westchester County

Full-scope kitchen renovations from concept through completion. Custom cabinetry, premium countertops, lighting, and expert installation — all managed by one experienced team since 2005.

Quick Answer

Three Brothers Kitchens and Baths provides full-scope kitchen renovations in Westchester County and Fairfield County — in-house design, custom cabinetry, premium countertops, plumbing, electrical, and full project management under one team. Investment ranges from $45,000 for targeted renovations to $250,000+ for full architectural gut renovations. Most projects complete in 8–14 weeks from design approval.

In-house design teamFull project managementTwo design showroomsLicensed & insured since 2005
A completed Three Brothers kitchen renovation in Chappaqua, NY — custom white oak cabinetry, Calacatta Gold marble waterfall island, and integrated professional appliances. One of 63 projects completed in Westchester and Fairfield County in 2025–2026.

2026 Field Data · Three Brothers Projects

Kitchen Renovation Benchmarks — Westchester & Fairfield County

Compiled from 63 kitchen renovation projects completed by Three Brothers in 2025–2026. These are actual project figures, not national industry averages.

MetricWestchester Co., NYFairfield Co., CTNational Avg.
Average full renovation cost$97,000$108,000$68,000
Targeted renovation (same footprint)$55K–$85K$60K–$92K$38K–$60K
Full gut renovation (custom)$165K–$300K+$175K–$320K+$95K–$175K
Average cabinetry spend (semi-custom)$41,000$44,000$22,000
Average countertop spend (quartz)$18,000$19,500$9,500
Typical project duration10–20 weeks10–20 weeks6–14 weeks
Labor premium vs. national median45–60%40–55%Baseline

Source: Three Brothers Kitchens and Baths project records, 2025–2026. Westchester County, NY and Fairfield County, CT. National averages per NKBA 2025 Cost Survey.

Full Scope

Everything Your Kitchen Renovation Needs

Three Brothers handles every aspect of your kitchen remodel in-house. From the first showroom visit to the final hardware installation, you work with one experienced team — not a patchwork of subcontractors.

Schedule Your Consultation
Custom & Semi-Custom Cabinetry
Quartz & Stone Countertops
Kitchen Islands & Peninsulas
Lighting Design
Plumbing & Fixtures
Flooring
Backsplash & Tile
Electrical Upgrades
Appliance Integration
Crown Molding & Trim

How It Works

Our Process

01

Showroom Visit & Consultation

Walk through our design center, explore cabinet styles, countertop samples, and hardware. No appointment needed at either Chappaqua or Congers location.

02

In-Home Measurement & Design

Our designers visit your home, take precise measurements, and create a 3D design layout with your selected materials and finishes.

03

Detailed Proposal

You receive a comprehensive, itemized proposal — no surprises. Once approved, we schedule your project and order your cabinetry.

04

Professional Installation

Our certified installation team handles every phase — demolition, cabinetry, countertops, plumbing, electrical, and final finishes.

05

Final Walkthrough

We walk through the completed kitchen together to ensure every detail meets your expectations before we consider the job done.

What to Expect

Investment & Timeline

$45,000 – $90,000

Targeted Scope Renovation

Cabinetry, countertops, and fixtures within existing layout — no structural changes.

$90,000 – $160,000

Full Kitchen Renovation

New layout, premium cabinetry, stone countertops, appliance integration, and all finish work.

$160,000 – $250,000+

Architectural Gut Renovation

Full structural reconfiguration, custom cabinetry, Sub-Zero / Wolf appliances, and bespoke specifications.

Ranges reflect Westchester & Fairfield County projects. Final investment depends on scope, materials, and site conditions. Itemized proposals provided after consultation.

Timeline

Project Timelines

2–4 weeks

Design & Material Selection

In-home measurement, 3D design, material sign-off, and cabinet ordering.

6–12 weeks

Lead Time (Custom Cabinetry)

Semi-custom ships in 4–6 weeks; fully custom in 8–12 weeks. Stock available in 1–2 weeks.

1–2 weeks

Demolition & Rough Work

Structural changes, plumbing and electrical rough-ins, and sub-floor preparation.

3–5 weeks

Installation & Finish

Cabinetry, countertop templating and install, tile, appliances, trim, and hardware.

1–3 days

Final Walk-Through

Punch list, appliance commissioning, and client walk-through.

Budget Planning Tool

Not sure what to budget?

Use our interactive cost calculator — built on 2026 Westchester & Fairfield County pricing.

Open Cost Calculator

What Goes Into the Work

Premium Materials & Finishes

We specify materials based on how your kitchen actually gets used — not what photographs well. These are the categories and standards we specify across our Westchester and Fairfield County projects.

Countertop Surfaces

  • Quartzite (Calacatta Gold, Super White)
  • Engineered quartz (Silestone, Cambria, Dekton)
  • Granite — for unique veining and character
  • Honed marble — for curated aesthetic spaces
  • Porcelain slab — large-format, low-maintenance

Cabinetry Construction

  • Full-overlay door construction
  • Furniture-grade plywood box (not particleboard)
  • Dovetail drawer joints
  • Soft-close hinges and drawer slides
  • Finish options: painted, stained, glazed, high-gloss

Appliance Integration

  • Sub-Zero refrigeration
  • Wolf range, cooktops, and wall ovens
  • Miele dishwashers and steam ovens
  • Thermador column refrigeration
  • Built-in panel-ready integration

Backsplash & Tile

  • Large-format porcelain (up to 48")
  • Handmade ceramic and terracotta
  • Zellige and artisan glass tile
  • Full-height slab backsplashes
  • Custom mosaic accent inserts

Fixtures & Hardware

  • Waterworks
  • Kallista
  • Brizo
  • Unlacquered brass and brushed nickel
  • Architectural hardware in custom finishes

Lighting & Electrical

  • Recessed LED with scene controls
  • Undercabinet lighting (hardwired)
  • Pendant and statement fixtures
  • In-cabinet and in-drawer lighting
  • Panel upgrades as needed

Kitchen Remodeling FAQs

What does a full kitchen remodel cost in Westchester County?

Kitchen remodels in Westchester County typically range from $45,000 for a mid-range renovation to $150,000+ for a luxury full-scope project with custom cabinetry and high-end appliances. We provide detailed proposals after an in-home consultation.

How long does a kitchen remodel take?

Most kitchen remodels take 6–12 weeks from design approval through final completion. Complex projects with structural changes may take longer. We provide a written timeline before work begins.

Do you handle all aspects of the kitchen remodel?

Yes. Three Brothers manages the complete project including design, cabinetry, countertops, plumbing, electrical, flooring, and final trim — so you work with one team throughout.

What cabinet brands do you carry?

We offer KraftMaid, Woodmode, Crystal, Kemper, Showplace, and Cardell — covering semi-custom through fully custom options at multiple price points.

Start Your Kitchen Project

Visit our showroom or call to request a private design consultation. No appointment needed at our Chappaqua or Congers locations.